Case Study

Dhaka Wasa

World’s Largest Public Utility in terms of house connections facing severe scrutiny on compliance for pre-treatment and treatment of water for the city.

48hours

Payback Period

LOCATION

Dhaka

Sample Capacity

500

LOCATION

Dhaka

Sample Capacity

500

1000X

ROI of Contract

Daily Production Capacity

2650 MLD

EMPLOYEES

4000

Daily Production Capacity

2650 MLD

EMPLOYEES

4000

Hydroquo+ : Solving Water Compliance Challenge At Scale

After installing the Hydroquo+ Solution, the client was able to:

Replace manual processes associated with water sample collection, testing, and analysis.

Integrate Hydroquo+ Hardware with existing SCADA systems.

Identify testing anomalies and pre-empt potential compliance issues.

Reduce time and expense associated with manual sample collections and lab testing.

Benefits

Autonomous testing

(set scheduled tests to meet your organization’s unique requirements)

Lab-accurate results

(results range from +/-3% to +/-10%)

Interoperability

(easily plug H+ into existing technology and infrastructure to centralize data effectively)

Simple analysis

(data collected is compiled in an easy to digest format to help operators read and react to data)

Modular hardware

(allowing companies to monitor from multiple strategic locations at once)